Before adding new equipment to your process, it is necessary to check that your electrical installation is adequate to supply it.
To do this, find in this article an infography of the 4 points of verification must be carried out on your electrical panel before proceeding with the evolution of your processes.
*If the manufacturer is no longer in business, ask another manufacturer about the possibility of evolution.
Find out more about
It is important to carry out a measurement campaign to perform a power survey. The central measuring station or meter recovers the consumption history and provides the maximum power used. Thus, you know your current maximum need before adding new devices.
Please note: the power is limited by the transformer's power.
Example: The switchboard is sized for 2500A. The current used is 1800A. There is still 700A available. However the transformer limits the available current (1600KVA - 2253A).
Please note: The use of reserve feeders available in stock is an emergency solution to temporarily compensate for the delay in supplying new feeders.
Generally these feeders are intended to guarantee the continuity of service of your installation in the event of a breakdown.
Read our article dedicated to
Please note: It is important to check the capacity of the branch busbar (column), i.e. the admissible current by comparing the characteristics given by the manufacturer with the current already consumed.
This can be done either by carrying out a one-off measurement with a clamp meter or by measuring the power drawn on each feeder.